Manage Construction Projects with Tasks, Photo Reports, Telegram & Google Sheets

How it works This template helps project managers collect task updates and photo reports from field workers via Telegram and stores everything in a Google Sheet. It enables daily project reporting without paper or back-office overhead.

High-level flow:

Workers receive daily tasks via Telegram

They respond with photo reports

Bot auto-saves replies (photos + status) to a Google Sheet

The system tracks task completion, adds timestamps, and maintains report history

Set up steps πŸ•’ Estimated setup time: 15–30 min You’ll need:

A Telegram bot (via BotFather)

A connected Google Sheet (with specific column headers)

A set of preconfigured tasks

πŸ‘‰ Detailed setup instructions and required table structure are documented in sticky notes inside the workflow.

Consulting and Training We work with leading construction, engineering, consulting agencies and technology firms around the world to help them implement open data principles, automate CAD/BIM processing and build robust ETL pipelines.

If you would like to test this solution with your own data, or are interested in adapting the workflow to real project tasks, feel free to contact us.

Docs & Issues:
Full Readme on GitHub

0
Downloads
306
Views
8.3
Quality Score
beginner
Complexity
Author:Artem Boiko(View Original β†’)
Created:8/13/2025
Updated:11/17/2025

πŸ”’ Please log in to import templates to n8n and favorite templates

Workflow Visualization

Loading...

Preparing workflow renderer

Comments (0)

Login to post comments